project details

Motetwerf Quay wall

St. Anna Baai, Curacao

Mei 2016 - Mei 2017

Client: NV Betonbouw Curacao

Project: 

  • Realisation 350 metre quay wall

Techniques used:

  • Vibratory driven sheet piling
  • Construction of grouting anchors through existing quay wall

Features:

  • Due to the heavy and intensive load placed on the quay wall, anchoring is added diagonally through the existing quay wall.

For this project a thread tap with hammer and a Vanthek International grouting anchor machine were shipped. The work was coordinated and implemented by two staff members, in cooperation with locally trained staff.