project details

Foundation Factory hall

Navagantes, Brazil

February 2014 - April 2015

Client: Huisman Ltda.

Project: 

  • Foundation for Factory hall
  • Design and construction of a hydraulic stearing table on existing Kobelco crane 2500G

Techniques used:

  • Construction 1200 precast concrete piles

Features:

  • For maximum capacity, precast concrete piles 46 metres in length were constructed for this project (50x50cm)
  • For this project, the design, engineering and construction of shear table was carried out by Vanthek.
  • The complete construction and mobilasation of the crane including diesel hammer and the shear table, as well as the project execution, was carried out by Vanthek Projects staff members.
  • Also, local staff were trained in order to optimise the operations that were to be carried out.

Two Vanthek Projects staff members were utilised for parts of this project.

call or mail for a quotation

+31 (0) 299 - 313057 request