project details

TBL piling MOF Phase 1 Project

Afungi, Mozambique

Project in collaboration with Alphahek

December 2019 - March 2021

Project:

  • Cellular Cofferdam Construction for a Temporary Beach Landing at Afungi, Mozambique

Techniques used:

  • Vibratory driven piling of in total 16 pieces cellular cells
  • Installation of over 1400 pcs of AS500-12 sheet piles
  • Cellular guiding frame based on diameter 14,1 m

Features:

  • Offshore operations of Marine installation project at the Coast of Mozambique
  • In-house engineering and designed hydraulic adjustable Cellular guiding frame

call or mail for a quotation

+31 (0) 299 - 313057 request
Cookie preferences

We use our own and third-party cookies for statistical and analytical purposes to give you the best experience on our website.

You can find more information in our cookie policy
We care about your privacy

You can set your cookie preferences by accepting or rejecting the different cookies described below

Necessary

Necessary cookies help make a website more usable by enabling basic functions such as page navigation and access to secure areas of the website. The website cannot function properly without these cookies.

Required
Preferences

Preference cookies allow a website to remember information that changes the way the website behaves or looks, such as your preferred language or the region you are in.

Statistics

Statistical cookies help website owners understand how visitors interact with websites by collecting and reporting information anonymously.