project details

Burullus Cofferdam

Burullus, Egypt

Installing (Part 1): February - July 2017

Removal (Part 2): March 2018

Client: Dredging International

Project:

  • Supply, construction and removal of complete cofferdam with embossing and anchoring for the purpose of installation HDPE pipelines.

Techniques used:

  • Vibratory driven piling of a total of 460 stretching metres of sheet piles (2*170+ 2*50+ 2*10)
  • 50 metre trench onshore, 120 metre trench offshore
  • Length sheet piles varÿing from 10 to 26 metres

Features:

  • Anchoring of the head curtain by way of an anchor or an anchor panel
  • All operations carried from a causeway constructed at the same time as the sheet pile

Three members of staff, along with all the necessary equipment for the construction of the sheet pile travelled to Egypt for this project.

call or mail for a quotation

+31 (0) 299 - 313057 request
Cookie preferences

We use our own and third-party cookies for statistical and analytical purposes to give you the best experience on our website.

You can find more information in our cookie policy
We care about your privacy

You can set your cookie preferences by accepting or rejecting the different cookies described below

Necessary

Necessary cookies help make a website more usable by enabling basic functions such as page navigation and access to secure areas of the website. The website cannot function properly without these cookies.

Required
Preferences

Preference cookies allow a website to remember information that changes the way the website behaves or looks, such as your preferred language or the region you are in.

Statistics

Statistical cookies help website owners understand how visitors interact with websites by collecting and reporting information anonymously.