project details

Cofferdam Nigeria

Idoho, Nigeria

Installing (Part 1): December 2017 - March 2018

Removal (Part 2): May -  July 2018

Client: Van Oord Dredging and Marine Contractors BV

Project:

  • Supply, construction and removal of complete cofferdam with embossing and anchoring for the purpose of installation HDPE pipelines.

Techniques used:

  • Vibratory driven piling of a double Cofferdam of 175 stretching meters 
  • 50 meter trench onshore, 120 meter trench offshore
  • Length sheet piles varying from 14 to 20 meters

Features:

  • All operations carried from causeways constructed at the same time as the sheet pile installation

Two teams consisting of piling workers, operators, mechanics and welders, along with all the necessary equipment for the construction of the sheet pile travelled to Nigeria for this project.

call or mail for a quotation

+31 (0) 299 - 313057 request
Cookie preferences

We use our own and third-party cookies for statistical and analytical purposes to give you the best experience on our website.

You can find more information in our cookie policy
We care about your privacy

You can set your cookie preferences by accepting or rejecting the different cookies described below

Necessary

Necessary cookies help make a website more usable by enabling basic functions such as page navigation and access to secure areas of the website. The website cannot function properly without these cookies.

Required
Preferences

Preference cookies allow a website to remember information that changes the way the website behaves or looks, such as your preferred language or the region you are in.

Statistics

Statistical cookies help website owners understand how visitors interact with websites by collecting and reporting information anonymously.