Pangani, Tanzania
Project in collaboration with Alphahek
September 2015 - October 2015
Client: Southern Engineering Co. Ltd. Project:
- Construction of 'Dolphins' for the purpose of a new jetty
Techniques used:
- Vibratory driven piling 42 tubular piles
- Tubular length 24-30 metres (508 Ø)
Features:
- Execution done by Vanthek Projects staff members assisted by trained local staff following the required training.
- Tubular piles 'shored' for the purpose of maximum firmness.