project details

Strand East

London, United Kingdom

September 2015 - February 2017

Client: Vastint Holding B.V.

Project:

  • Design and Construction of 1000 m quay wall consisting of 250 tons sheet piles, for the purpose of a new sheet pile wall

Techniques used:

  • Techniques press in (silent pile, ABI silent press) and vibratory driven of sheet piles 
  • Construction of 900 grouting anchors
  • Construction of 600 metre prefabricated concrete capping beam

Features: 

  • In total throughout this project 15 staff members were sent to London. 

All sheet piles, sleeves, grouting anchors, various wire cranes, drilling cranes silent pilers and excavators were shipped from the Netherlands directly to London.

call or mail for a quotation

+31 (0) 299 - 313057 request