Mombasa, Kenya
Project in collaboration with Alphahek
September 2020 - Ongoing
Project:
- Offshore and onshore Steel piling works at Mwache Bridge & Mteza Bridge at Mombasa, Kenya
Techniques used:
- Vibratory driven piling of in total 650 steel tubular piles
- Static load tests (SLT)
- Tubular piles with a diameter of 600 and 1500 mm
- Length tubular piles varies upto 41.5 meter
Features:
- Operations carried out from land (onshore) and barge (offshore) at Mombasa, Kenya.
Staff member of Vanthek Projects provided supervision and training during the construction of the steel piling works.