project details

Poti Port, Georgia

Rehabilitation Poti Port

Poti, Georgia

July 2020 - July 2021

Client: Prime Concrete LLC

Project: 

  • Supply and installation of Steel sheet piles for the rehabilitation of approximately 300 metres along the existing quay, a dolphin and two piers at Poti Port. The dolphin and piers are constructed as cellular constructions.

Techniques used:

  • Vibratory driven piling of flat and AZ sheet piles  

Features: 

  • For this project we engineered and designed a modular guiding frame, based on seperate moving platforms

Two staff members of Vanthek Projects travelled to Georgia along with materials and equipment for the construction of the quay, dolphin and piers.