project details

Poti Port, Georgia

Rehabilitation Poti Port

Poti, Georgia

July 2020 - July 2021

Client: Prime Concrete LLC

Project: 

  • Supply and installation of Steel sheet piles for the rehabilitation of approximately 300 metres along the existing quay, a dolphin and two piers at Poti Port. The dolphin and piers are constructed as cellular constructions.

Techniques used:

  • Vibratory driven piling of flat and AZ sheet piles  

Features: 

  • For this project we engineered and designed a modular guiding frame, based on seperate moving platforms

Two staff members of Vanthek Projects travelled to Georgia along with materials and equipment for the construction of the quay, dolphin and piers.

call or mail for a quotation

+31 (0) 299 - 313057 request
Cookie preferences

We use our own and third-party cookies for statistical and analytical purposes to give you the best experience on our website.

You can find more information in our cookie policy
We care about your privacy

You can set your cookie preferences by accepting or rejecting the different cookies described below

Necessary

Necessary cookies help make a website more usable by enabling basic functions such as page navigation and access to secure areas of the website. The website cannot function properly without these cookies.

Required
Preferences

Preference cookies allow a website to remember information that changes the way the website behaves or looks, such as your preferred language or the region you are in.

Statistics

Statistical cookies help website owners understand how visitors interact with websites by collecting and reporting information anonymously.